Record before disturbance.
Document the site before clearance, demolition or earthworks. An incomplete or retrospective baseline is labelled honestly.
A development changes more than a building. It changes the living ground around it.
The Ecological Registry proposes a lasting record of what was there, what is retained, what is delivered and what establishes. A way to make a garden’s ecological performance visible beyond handover.
The Registry is active. This developer pathway is a proposal for testing with partners. It is not a government-approved standard or a planning approval.
Garden-area, canopy and vegetation controls already exist. The next step is to connect them to a dated record of the site before development and the living landscape after it.
A drawing cannot establish plant survival, recovering soil or functioning habitat. The proposed pilot would check delivery and establishment, with responsibility for follow-up agreed from the outset.
Existing Victorian context: garden-area requirements and canopy-tree protections. Applicable requirements depend on the site and proposal.
These draft principles will be tested through a pilot and refined with independent input.
Document the site before clearance, demolition or earthworks. An incomplete or retrospective baseline is labelled honestly.
Keep mature trees, valuable habitat and soil in view. New planting and extra points cannot automatically compensate for their loss.
Use the local ecological community and site constraints. A grassland and a woodland need different reference conditions.
A design target, an installed landscape and established ecological function are distinct claims, each with a date and evidence.
Record developer, designer, steward and verifier separately. Test a method that trained assessors can apply consistently.
Agree who maintains planting, replaces failures, funds reassessment and remedies shortfalls through establishment.
Report area, retained assets and all five pillars. A higher score alone is not proof of biodiversity net gain or a functioning corridor.
Give the next steward the ecological history and care plan. Publish only agreed information; keep addresses and contact details private.
Record existing species, layers, canopy, soil and water observations, habitat features and surrounding patches. Identify retained assets and uncertainties.
BASELINE · EXISTING CONDITIONSet explicit protection measures, planting and habitat specifications, evidence requirements and establishment targets. Keep future performance clearly labelled.
PROPOSAL · NOT A VERIFIED OUTCOMEInspect what is installed, record departures from the plan and name the responsible caretaker. Young planting is recorded as young planting.
AS BUILT · DELIVERY CHECKReturn at agreed intervals to document survival, actual canopy, habitat and condition. Suggested pilot checks are around 12 and 24 months after planting, with longer monitoring where needed.
FOLLOW-UP · MEASURED CONDITIONIndigenous species, layers and canopy.
Documented condition and water function.
Habitat features and recorded fauna.
The garden’s documented landscape context.
What is known, how it is recorded and who checked it.
The Registry currently uses a 0–100 garden score. Before any regulatory threshold, the developer method needs independent validation, reference-relative benchmarks and protections that cannot be traded for points.
Explore the current scoring methodAustralia’s energy ratings provide a precedent for the process, not an ecological formula to copy.
Five-star requirements entered the national Building Code in 2006, supported by regulatory analysis. The scheme continued to be evaluated and strengthened. Victoria implemented newer seven-star provisions in May 2024.
Commonwealth five-star history · Victorian seven-star implementation
Bring developers, council officers, independent ecologists, research partners and Traditional Owners into method development. Test consistency, outcomes, cost and practical responsibility before seeking policy recognition.
Future planning recognition or disclosure would require the relevant government process. Participation, funding and assessment arrangements will be agreed before a pilot begins.
We’re seeking conversations about an independently evaluated Victorian pilot. Ideally, join before works begin so the existing landscape can be recorded.
The pilot scope, fees, targets and assessment arrangements would be agreed with participants.